BHP Billiton – Olympic Dam, SA |
|
Return to Project List
- Developed the following:
- Mechanical, Electrical & Instrumentation Work Instructions
- Standard Operating Procedures
- Training competencies
- Fine tuned all isolations, Permit to Work, confined space, hot work permit, etc documentation
- Defined permit huts, lock boxes, locks, critical isolation material
- Created special case registers (i.e. whereby positive isolation can not be achieved)
- Created Permit to Work and isolation management procedures
- Created training material (i.e. Presentations, Authorisation forms, scripts for filming)
- Reviewed & added relevant information in engineering specifications to meet the intent of FRCP 8
- Facilitation of key stakeholders in the development of a Safety Management plan for major maintenance shutdowns within the Mine Fixed plant and Infrastructure area
- Developed THA's and Work Instructions for the maintenance Planning Department
- Created Safety and Technical information manuals for the electrical department
- Developed Maintenance Work Instructions for the new Scats Vibrating Screen Facility
- Provided advice and assistance to the Smelter Department personnel with the implementation and coordination of the Permit to Work, Energy Control and other safety system requirements
- Developed work instructions and other documents associated with the RCM implementation project
- Assisted the Concentrator Hydromet area to develop Task Hazard Analysis (THA) documents required for the Dual Mill Shutdown
- Provided advice and assistance to Concentrator Hydromet Department personnel with the implementation and coordination of the Permit to Work, Energy Control and other safety system requirements
- Edited and developed HSEC documentation
- Provided Permit to Work and Isolation Training Facilitation
- Provide Permit Acceptor Training
- Provided consultant for the implementation of the FRCS 3.8 Confined Space Management System
|